Whip Mix Infinity Operator's Manual

Browse online or download Operator's Manual for Water heaters & boilers Whip Mix Infinity. Whip Mix Infinity Operator`s manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Infinity
Burnout Furnaces
TM
OPERATOR’S MANUAL
IJ15813 02/11
1–800–626–5651
1–502–637–1451
www.whipmix.com
Infinity is a trademark of Whip Mix
®
©2011 Whip Mix
®
.
Page view 0
1 2 3 4 5 6 ... 31 32

Summary of Contents

Page 1 - Infinity

InfinityBurnout FurnacesTMOPERATOR’S MANUALIJ15813 02/111–800–626–5651 1–502–637–1451www.whipmix.comInfinity is a trademark of Whip Mix®©2011 Whip Mix

Page 2 - INTRODUCTION

PROGRAM AND OPERATE – ONE STAGE PROGRAM (Figure 1)9OPERATION1. Turn the power switch on.2. Press PROGRAM NUMBER. Use to display the desired

Page 3

PROGRAM AND OPERATE – ONE STAGE PROGRAM (Figure 1)9OPERATION1. Turn the power switch on.2. Press PROGRAM NUMBER. Use to display the desired

Page 4 - SPECIFICATIONS

OPERATIONPROGRAM AND OPERATE – THREE STAGE PROGRAM (Figure 1)111. Follow Two Stage Program, Steps 1 – 4.2. Press ENTER / REVIEW. STAGE 2 lig

Page 5

OPERATIONPROGRAM AND OPERATE – THREE STAGE PROGRAM (Figure 1)111. Follow Two Stage Program, Steps 1 – 4.2. Press ENTER / REVIEW. STAGE 2 lig

Page 6

OPERATIONREVIEW A PROGRAM (Figure 1)131. Turn the power switch on.2. Press PROGRAM NUMBER.3. Press to select the program number to be revie

Page 7

OPERATIONREVIEW A PROGRAM (Figure 1)131. Turn the power switch on.2. Press PROGRAM NUMBER.3. Press to select the program number to be revie

Page 8 - INSTALLATION

NIGHT TIMEDELAY STARTOPERATIONSAMPLE ONE STAGE PROGRAM(To be completed and ready to cast in 24 hours) HEAT RATETEMPHOLD TIMESTAGE 1STAGE 2STAGE 3STAGE

Page 9

NIGHT TIMEDELAY STARTOPERATIONSAMPLE ONE STAGE PROGRAM(To be completed and ready to cast in 24 hours) HEAT RATETEMPHOLD TIMESTAGE 1STAGE 2STAGE 3STAGE

Page 10 - OPERATION

ERROR CODESNOTE: “Beeps” occur when the Error Code appears on the Main DisplayERRORCODEDESCRIPTIONPROBABLE CAUSEINVALID ENTRY ERROR: STAGE, HEAT RAT

Page 11

ERROR CODESNOTE: “Beeps” occur when the Error Code appears on the Main DisplayERRORCODEDESCRIPTIONPROBABLE CAUSEINVALID ENTRY ERROR: STAGE, HEAT RAT

Page 12

1Introduction ...2 Warranty ...

Page 13

19CAUTION: The INFINITY should be serviced only by qualified service technicians. Be sure to unplug the power cord and wait for the furnace to cool b

Page 14

19CAUTION: The INFINITY should be serviced only by qualified service technicians. Be sure to unplug the power cord and wait for the furnace to cool b

Page 15

1. Remove the back panel of the furnace.2. Remove the nuts which hold the heating plate wires to the power terminals and straighten the heating pl

Page 16

1. Remove the back panel of the furnace.2. Remove the nuts which hold the heating plate wires to the power terminals and straighten the heating pl

Page 17

1. Remove the front panel (Figure 5).2. Note and record the color and location of each wire on the thermocouple terminals located on the Main PC Bo

Page 18 - ERROR CODES

1. Remove the front panel (Figure 5).2. Note and record the color and location of each wire on the thermocouple terminals located on the Main PC Bo

Page 19

1. Remove the bottom front panel and the upper and lower rear panels of the furnace. (Note the position of the vent louvers on the rear panels.)2.

Page 20 - 1–800–626–5651

1. Remove the bottom front panel and the upper and lower rear panels of the furnace. (Note the position of the vent louvers on the rear panels.)2.

Page 21

27SPARE PARTS LISTDESCRIPTION 115V 220/230V Power Cord Kit–Japan & U.S. 15288 N/APower Cord Kit–Australia N/A 23206Power Cord Kit–England N

Page 22 - FIELD SERVICE

27SPARE PARTS LISTDESCRIPTION 115V 220/230V Power Cord Kit–Japan & U.S. 15288 N/APower Cord Kit–Australia N/A 23206Power Cord Kit–England N

Page 23

1Introduction ...2 Warranty ...

Page 24

PROGRAM CARD FORMSSTAGE 1STAGE 2STAGE 3STAGE 4 HEAT TEMP HOLD RATE TIMEProgram # Metal(s)STAGE 1STAGE 2STAGE 3STAGE 4 HEAT TEMP HOLD

Page 25

PROGRAM CARD FORMSSTAGE 1STAGE 2STAGE 3STAGE 4 HEAT TEMP HOLD RATE TIMEProgram # Metal(s)STAGE 1STAGE 2STAGE 3STAGE 4 HEAT TEMP HOLD

Page 26

InfinityBurnout FurnacesTMOPERATOR’S MANUALIJ15813 02/111–800–626–5651 1–502–637–1451www.whipmix.comInfinity is a trademark of Whip Mix®©2011 Whip Mix

Page 27

SPECIFICATIONSINFINITY M–30 INFINITY L–30Electrical115V 50/60Hz 1150W220/230V 50/60Hz 1150W115V 50/60Hz 1610W220/230V 50/60Hz 1610WCapacity 8-1 3

Page 28 - SPARE PARTS LIST

SPECIFICATIONSINFINITY M–30 INFINITY L–30Electrical115V 50/60Hz 1150W220/230V 50/60Hz 1150W115V 50/60Hz 1610W220/230V 50/60Hz 1610WCapacity 8-1 3

Page 29

5Figure 1INFINITY M–30 AND L–30 IDENTIFICATION 13101198765124321Front PanelHeating ChamberVentTubeKEY PARTS IDENTIFICATION AND EXPLANATION220/230KEY P

Page 30 - PROGRAM CARD FORMS

5Figure 1INFINITY M–30 AND L–30 IDENTIFICATION 13101198765124321Front PanelHeating ChamberVentTubeKEY PARTS IDENTIFICATION AND EXPLANATION220/230KEY P

Page 31

UNPACK AND SET–UPINSTALLATION71. Unpack the contents of the box. Remove the following materials: A. Vent Tube – Remove from bubble wrap and insert i

Page 32

UNPACK AND SET–UPINSTALLATION71. Unpack the contents of the box. Remove the following materials: A. Vent Tube – Remove from bubble wrap and insert i

Comments to this Manuals

No comments